Cloud migration assessment: sample report

This is what you receive at the end of the £999 assessment: the real format and every section, written for a fictional company with invented figures.

How to read this report

  1. 1. Summary
    The answer to your question, in one line, with the key numbers.
  2. 2. Findings
    What we found, the evidence, what it means for the business, and the fix with its effort and cost.
  3. 3. Your action plan
    The fixes in order: first 30 days, 30 to 90 days, 3 to 12 months.
  4. 4. Decisions for you
    The few yes or no questions that need your budget or authority.

Illustrative sample: Corrick Components Ltd is a fictional company and every figure is invented. It shows the format and depth of a real report, not a client result.

Innoligo cloud migration assessment · Final report

Corrick Components Ltd

Fictional UK manufacturer, 140 staff on two sites, 14 virtual servers on 3 hosts whose warranty ends in March, an on-premises ERP system.

The question: Our servers are out of warranty. Do we replace them or move to Azure?

1Executive summary

Neither extreme. A hybrid move saves £18,000 over five years and removes most of the hardware risk.

Moving everything to Azure would cost more than refreshing the servers, mainly because the ERP system needs a large, always-on server. Replacing everything like for like keeps all the risk on site. The best value is hybrid: move files to SharePoint and nine servers to Azure, keep the ERP on one new host until the ERP supplier's cloud version is available in 2028.

  • 3 options

    costed over five years, like for like

  • £170,000

    five-year cost of the recommended hybrid option

  • £18,000

    lower than a like-for-like refresh, over five years

2Scope and method

What we looked at

  • Inventory of the 14 servers, storage and network links
  • Application dependencies, including the ERP and its database
  • Current five-year cost: hardware, licences, power, support
  • Azure sizing and pricing, with and without reservations
  • Migration effort, risk and sequencing

Access and evidence

  • Read-only access to the virtualisation platform for 4 weeks of performance data
  • ERP supplier's roadmap (shared under NDA)
  • Interviews with the Operations Director and the IT manager

Not included

  • Running the migration
  • Renegotiating the ERP contract
  • Network redesign beyond the internet links

3Cloud readiness by area (out of 5)

  • IdentityOn-premises Active Directory, syncs to Entra ID3 / 5
  • Network linksSecond site on a single 100 Mbps line2.5 / 5
  • File data4 TB, suits SharePoint and OneDrive4 / 5
  • ApplicationsERP not supported in Azure by its supplier until 20282 / 5
  • Backup and recoveryBackups good; no off-site copy3 / 5
  • Skills and supportOne IT manager; no Azure experience2.5 / 5

4Findings, ranked

Every finding has the evidence behind it, what it means for the business, the fix, the effort and the cost. A real report adds an evidence appendix with the underlying exports.

  1. 1.HighHardware out of warranty in March

    Evidence
    All 3 hosts are 7 years old; warranty extension quoted at £9,400 a year.
    Business impact
    A host failure would stop production scheduling for days.
    Fix
    Decide the target by December so the move or refresh finishes before March.
    Effort
    Decision now
    Cost
    Avoids £9,400 a year extension
  2. 2.HighERP not supported in Azure until 2028

    Evidence
    ERP supplier supports only on-premises or its own cloud from Q2 2028.
    Business impact
    Moving the ERP to Azure now would leave it unsupported.
    Fix
    Keep the ERP on one new host; plan to move to the supplier's cloud in 2028.
    Effort
    Part of the refresh
    Cost
    £18,000 for one host
  3. 3.MediumSingle internet line at the second site

    Evidence
    One 100 Mbps line, no backup line.
    Business impact
    With servers in Azure, a line failure stops the second site working.
    Fix
    Add a second line from a different provider before moving any server.
    Effort
    6 to 8 weeks lead time
    Cost
    £2,400 a year
  4. 4.MediumServers over-sized for their load

    Evidence
    Average CPU use 18%; 5 servers idle outside working hours.
    Business impact
    Like-for-like sizing in Azure would overpay by about a third.
    Fix
    Right-size in Azure and switch off 5 servers out of hours.
    Effort
    Built into migration
    Cost
    Saves about £6,000 a year in Azure
  5. 5.LowFile server suits SharePoint

    Evidence
    4 TB of documents, mostly by department, few very large files.
    Business impact
    A server, its backup and its licence can be retired.
    Fix
    Move departmental shares to SharePoint and OneDrive in 3 waves.
    Effort
    4 weeks
    Cost
    Included in existing licences

5Five-year cost of each option

OptionFive years
A. Refresh like for like: £68,000 hardware, then £24,000 a year to run£188,000
B. Everything to Azure: £32,000 migration, then £33,000 to £41,000 a year£197,000 to £237,000
C. Hybrid (recommended): £22,000 migration, £18,000 ERP host, then £26,000 a year£170,000
Hybrid compared with refresh£18,000 lower

Running costs include power, support, licences and Azure consumption. Azure range depends on reserving capacity for 3 years. All figures excluding VAT.

6Savings and costs to test

ItemRangeConfidence
Hybrid against like-for-like refresh, over 5 years
Central estimate £18,000
£10,000 to £25,000Medium
Warranty extension avoided
Quoted by the hardware supplier
£9,400 a yearHigh
Out-of-hours shutdown of 5 Azure servers
Included in option C's running cost
£4,500 to £6,000 a yearMedium

The larger benefit is risk: after the move, a single host failure affects only the ERP, and that host is new and under warranty.

7Your action plan

The fixes, sorted into three time buckets so nothing is overwhelming: quick wins first, then planned work, then longer-term improvements. Hand it to your IT provider, or to us, and say "do this, in this order".

  1. First 30 days: quick wins

    • Board decision on option C
    • Order the second internet line
    • Order one ERP host
  2. 30 to 90 days: planned work

    • Move files to SharePoint in 3 waves
    • Migrate 9 servers to Azure, right-sized
    • Move the ERP to the new host
  3. 3 to 12 months: longer term

    • Retire the 3 old hosts
    • Reserve Azure capacity once usage settles
    • Plan the 2028 move to the ERP supplier's cloud

8Decisions for you to make

The few questions IT cannot answer alone, because they need budget or authority. Your owner or directors can settle them in one meeting.

  1. Choose option C (hybrid) and approve £40,000 of one-off spend.
  2. Approve a second internet line at the second site before any server moves.
  3. Decide whether to use a partner for the migration or train the IT manager.

The report ends with a senior readout: a one-hour session to walk through the findings and these decisions with you and anyone else who needs to be there. The report, findings and plan are yours to keep and use with any supplier.

What this report was worth to Corrick

  • A decision made before the warranty deadline, not forced by a failure
  • About £18,000 lower five-year cost than refreshing, with less risk
  • A plan that respects the ERP supplier's roadmap instead of fighting it

Fictional example. Your findings and figures will be your own.

Get this for your business

£999 fixed price. 4 to 6 weeks. Read-only access.

Clear-answer guarantee. If your assessment does not give you at least three specific, costed actions worth taking, we refund the full fee. Just tell us within 14 days of your readout. Terms.