VMware to Azure assessment: sample report

This is what you receive at the end of the £999 assessment: the real format and every section, written for a fictional company with invented figures.

How to read this report

  1. 1. Summary
    The answer to your question, in one line, with the key numbers.
  2. 2. Findings
    What we found, the evidence, what it means for the business, and the fix with its effort and cost.
  3. 3. Your action plan
    The fixes in order: first 30 days, 30 to 90 days, 3 to 12 months.
  4. 4. Decisions for you
    The few yes or no questions that need your budget or authority.

Illustrative sample: Selby Vale Insurance Services is a fictional company and every figure is invented. It shows the format and depth of a real report, not a client result.

Innoligo vmware to azure assessment · Final report

Selby Vale Insurance Services

Fictional UK insurance broker, 220 staff, 70 virtual machines on 6 VMware hosts, renewal quote received under per-core licensing.

The question: Our VMware renewal has more than doubled. Should we move to Azure?

1Executive summary

Right-size and renew for three years. Moving now would cost more and add risk.

The renewal quote counts 192 cores and costs 2.3 times what Selby Vale pays today. But the hosts are lightly used. Consolidating onto 4 hosts cuts the licence cost by a third. Azure VMware Solution would cost several times more at this size, and re-platforming 70 machines to Azure is a two-year programme. Renew smaller, then move selected workloads to Azure over the term.

  • 2.3 ×

    renewal quote against today's VMware cost

  • 6 → 4

    hosts needed after consolidation

  • £28,000

    lower three-year cost than the quote, licences, support and power

2Scope and method

What we looked at

  • VMware estate: hosts, CPUs, cores, virtual machines and utilisation
  • The renewal quote, line by line
  • Three-year cost of four options, including hardware, power and support
  • Azure VMware Solution and Azure IaaS sizing
  • Which workloads suit Azure first

Access and evidence

  • Read-only vCenter access for 30 days of performance data
  • The renewal quote and current contract
  • Interviews with the Head of IT and the Finance Director

Not included

  • Negotiating with Broadcom or a reseller
  • Running the consolidation or migration
  • Disaster recovery redesign

3Estate profile by area (out of 5)

  • Host utilisationAverage CPU 31%, memory 54%1.5 / 5
  • Licence efficiencyPaying for 192 cores; 128 would do2 / 5
  • Workload fit for Azure20 of 70 machines easy to move3 / 5
  • Hardware ageHosts 3 years old, under warranty3.5 / 5
  • Team skillsStrong VMware, limited Azure3 / 5

4Findings, ranked

Every finding has the evidence behind it, what it means for the business, the fix, the effort and the cost. A real report adds an evidence appendix with the underlying exports.

  1. 1.HighQuote is for more capacity than you use

    Evidence
    6 hosts × 2 CPUs × 16 cores = 192 cores at £118 per core per year. Average CPU use is 31%.
    Business impact
    £22,660 a year against £9,800 paid today.
    Fix
    Consolidate to 4 hosts before renewal and requote for 128 cores.
    Effort
    3 weeks
    Cost
    Saves about £7,550 a year
  2. 2.HighRenewal date is close

    Evidence
    Renewal due in 11 weeks; consolidation needs about 6.
    Business impact
    Signing under time pressure locks in the larger quote for the full term.
    Fix
    Ask for a short extension now; consolidate, then requote.
    Effort
    1 week to agree
    Cost
    None
  3. 3.MediumAzure VMware Solution is poor value at this size

    Evidence
    Minimum 3 dedicated nodes; estimated at several times the on-premises cost, plus VCF licences bought from Broadcom.
    Business impact
    Moving there would raise cost, not reduce it.
    Fix
    Do not pursue now; revisit if the estate grows or a data centre exit is needed.
    Effort
    None
    Cost
    Avoided
  4. 4.Medium20 machines suit Azure now

    Evidence
    Web, file and test servers with no special dependencies.
    Business impact
    Moving them over the term reduces the next renewal further.
    Fix
    Move the 20 to Azure IaaS in years 1 and 2.
    Effort
    4 to 6 months, phased
    Cost
    Included in the option D estimate
  5. 5.LowTwo hosts become spare

    Evidence
    After consolidation, 2 hosts are surplus.
    Business impact
    Hardware support and power on 2 hosts can stop.
    Fix
    Keep one as a cold spare for disaster recovery; retire the other.
    Effort
    1 day
    Cost
    Saves about £1,800 a year

5Three-year licence cost of each option

OptionThree years
Renew as quoted: 192 cores × £118 × 3£67,970
Right-size, then renew: 128 cores × £118 × 3£45,310
Azure VMware Solution: 3 nodes plus VCF licencesSeveral times higher
Re-platform all 70 machines to AzureHigher in years 1 to 3, plus a 2-year programme
Right-size against the quote£22,660 lower

Licence cost only; the full report compares hardware, power and support too. Per-core price from the quote received. Excludes VAT.

6Savings and costs to test

ItemRangeConfidence
Right-size from 192 to 128 licensed cores
Quote price, fewer cores
£22,660 over three yearsHigh
Support and power on 2 retired hosts
One host kept as a spare
£5,400 over three yearsMedium
Smaller renewal in year 4 after moving 20 machines
Depends on the next quote
£3,000 to £8,000 a year from year 4Low

Together, about £28,000 lower over three years than signing the quote as is, with the option to shrink VMware further at the next renewal. Ranges are to be tested, not promises.

7Your action plan

The fixes, sorted into three time buckets so nothing is overwhelming: quick wins first, then planned work, then longer-term improvements. Hand it to your IT provider, or to us, and say "do this, in this order".

  1. First 30 days: quick wins

    • Request a renewal extension
    • Plan the consolidation to 4 hosts
    • Agree which 20 machines move to Azure first
  2. 30 to 90 days: planned work

    • Consolidate to 4 hosts
    • Requote for 128 cores and renew for three years
    • Retire one host; keep one as a spare
  3. 3 to 12 months: longer term

    • Move the first 10 machines to Azure
    • Train two staff on Azure
    • Review the estate before the year-4 renewal

8Decisions for you to make

The few questions IT cannot answer alone, because they need budget or authority. Your owner or directors can settle them in one meeting.

  1. Ask for a renewal extension this week.
  2. Approve consolidation to 4 hosts and a three-year renewal at 128 cores.
  3. Approve a phased move of 20 machines to Azure over the term.

The report ends with a senior readout: a one-hour session to walk through the findings and these decisions with you and anyone else who needs to be there. The report, findings and plan are yours to keep and use with any supplier.

What this report was worth to Selby

  • About £28,000 lower three-year cost than signing the quote
  • An expensive move to Azure VMware Solution avoided, with the reasons on paper
  • A path to shrink VMware further at the next renewal, on your timetable

Fictional example. Your findings and figures will be your own.

Get this for your business

£999 fixed price. 4 to 6 weeks. Read-only access.

Clear-answer guarantee. If your assessment does not give you at least three specific, costed actions worth taking, we refund the full fee. Just tell us within 14 days of your readout. Terms.